arrow_backBack to Blog
Policy

PM e-DRIVE Scheme: Complete Operator's Guide for FY2026 Claims

With FAME II concluded and PM e-DRIVE in full swing, CPOs and fleet operators face new subsidy claim procedures. Here's a step-by-step walkthrough of the eligibility criteria, documentation, and disbursement timelines under the ₹10,900 crore scheme.

person
Go4Garage Policy Team· Policy Research Specialists
·Mar 2026·schedule9 min read

₹10,900Cr

Total scheme outlay

41.4L

Target EVs to be supported

₹2,000Cr

Charging infra component

PM e-DRIVE: What It Is and Why It Replaced FAME II

The PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM e-DRIVE) scheme, approved by the Cabinet in September 2024 with a ₹10,900 crore outlay spanning FY2024-25 and FY2025-26, represents India's second-generation central EV incentive programme. Unlike FAME II, which used a demand-linked subsidy model that proved vulnerable to fraudulent claims from non-compliant OEMs, PM e-DRIVE uses a direct benefit disbursement model with tighter OEM registration requirements and real-time VahanDB linkage — significantly improving accountability and reducing leakage.

Eligible Vehicle Categories and Subsidy Quantum

  • check_circleElectric two-wheelers: ₹5,000 per kWh, maximum ₹10,000 per vehicle (2–4 kWh pack most common)
  • check_circleElectric three-wheelers — L5 passenger and L5M cargo: ₹25,000 per vehicle
  • check_circleElectric intracity buses, 9–12 metre: ₹20 lakh per bus
  • check_circleElectric intracity buses, 12+ metre: ₹35 lakh per bus
  • check_circleElectric ambulances: ₹10 lakh per vehicle under a dedicated sub-scheme
  • check_circleEV charging infrastructure: eligible CPOs claim infrastructure support via the MoP portal separately

The Claim Process: Step by Step

  • check_circleStep 1 — OEM Registration: Vehicle manufacturer registers on the PM e-DRIVE portal with VahanDB integration credentials. Only vehicles from registered OEMs are eligible.
  • check_circleStep 2 — VahanDB Linkage: At point of sale, the OEM dealer registers the vehicle in VahanDB with EV-specific fields: battery capacity (kWh), OEM registration ID, and subsidy claim flag.
  • check_circleStep 3 — Subsidy Disbursement: Ministry of Heavy Industries (MHI) disburses subsidy directly to the OEM bank account monthly, based on verified VahanDB sales data from the previous month.
  • check_circleStep 4 — Buyer Price Reduction: OEM passes through the subsidy as a price reduction at point of sale. The buyer receives the discounted price; invoice documents the subsidy amount applied.
  • check_circleStep 5 — Charging Infra Claims (CPOs): File a separate application on the MoP EVSE Infra portal with DISCOM approval, installation photos, and BIS certification documents.
lightbulb

Key Detail for Buyers: You do not need to file any subsidy claim yourself for the vehicle component. The PM e-DRIVE subsidy is processed entirely by the OEM and automatically reflected in the vehicle price. Verify the subsidy amount on your purchase invoice.

Documentation CPOs Need for Charging Infra Claims

  • check_circleValid DISCOM connection approval letter for the site
  • check_circleBIS certification of charging equipment (IS 17017 Part 2 for AC, Part 3 for DC)
  • check_circleGeo-tagged installation photographs — minimum 4 angles showing the charger, site, and meter
  • check_circleSite address proof and ownership or lease documents
  • check_circleGSTIN and PAN of the claiming entity
  • check_circleBank account details for direct benefit transfer
  • check_circleFor chargers above 50 kW: electrical safety certificate from a licensed electrical inspector

Common Rejection Causes

  • check_circleOEM not registered on PM e-DRIVE portal — verify eligibility before vehicle purchase
  • check_circleVehicle registered in VAHAN with incorrect battery capacity (mismatch from OEM data)
  • check_circleDealer submitted incorrect OEM registration ID — verify subsidy certificate at time of delivery
  • check_circleFor infra claims: charger model not in the current BIS-approved equipment list
  • check_circleFor infra claims: DISCOM connection registered under a different entity name than the applicant
  • check_circleInfra claim submitted after the 90-day post-commissioning window has closed

Timeline and Disbursement

For vehicle subsidies, disbursement to OEMs typically occurs within 45–60 days of the monthly data cut-off based on VahanDB verification. For charging infrastructure claims, the MoP EVSE portal processes applications within 90 working days of a complete submission — though in practice, straightforward claims with complete documentation are typically cleared within 60–75 days. Go4Garage's URGAA platform tracks PM e-DRIVE claim status in real-time, sends alerts for document deficiencies, and maintains a complete audit trail for all subsidy interactions, supporting both annual compliance and any future inspections.

Ready to Transform Your Operations?

See how Go4Garage's AI platform handles compliance, maintenance, and operations — end to end, across all 33 states.